Infrastructure & Roads
Infrastructure & Roads
Throughout the UK and Ireland we have treated millions of m3 of unsuitable materials to be reused in motorway and "A" road projects.
The processes we can use include:
- Bulk Fill
- Sub Base Replacement
- Non Frost Suceptible Layers
- Rolling Dynamic Compaction
- Capping Replacement
- Cement Based Granular Material
We have successfully used various combinations of the methods above depending upon the specific road project and the client's requirements.
Infrastructure & Roads Projects
Some of the projects we have worked on include:
-
M77, South Renfrewshire for Morrison Construction
Bulk Fill Modification and Capping Layer treating a volume of approximately 300,000 m3 -
A1 Dunbar Accommodation Road for Morrison Construction
Stabilisation and Formation of Roadbase treating a volume of approximately 10,000 m3 -
Spittleborough Replacement Accommodation Bridge for Balfour Beatty Plc
ECO-WARRIOR Modification treating a volume of approximately 60,000 m3 -
N3 Dunshaughlin for Willis Bros Ltd
Bulk Fill Modification treating a volume of approximately 190,000 m3 -
N7 / N8 for Ascon Contractors
Bulk Fill Modification and Capping Layer treating a volume of approximately 360,000 m3 -
M3 Navan and N3 Clonlee to North Kells for SIAC Construction Ltd
Stabilisation and Modification treating a volume of approximately 250,000 m3 -
Shiremoor By-Pass for Owen Pugh Holdings Ltd
Stabilisation treating a volume of approximately 20,000 m3